This service is designed to offer the assistance for the procurement activities in China both technically and commercially, characterized by the turnkey solutions including:
Identifying Potential Suppliers
Sunrise QC assists to evaluate potential suppliers,based on our professionalism and sound understanding of the manufacturers in local area, by investigating their existing quality management systems, and identifying their strength and weakness. This evaluation identifies all unfavorable factors to the clients. Correct selection of suppliers ensures that both the final product quality and delivery schedule satisfy clients’ requirements.
Supplier Assessment
The work scope of supplier assessment includes:
1. Preliminary assessmment: Distribute the questionnaires, collect and analyze the documents submitted by the suppliers, and then prequalification analysis is made according to the evaluation procedure of SRQC.
2. Factory site audit: Site audit covers the QMS audit and technical competency survey as well as the social accountability evaluation of the potential suppliers.
So far, SRQC has conducted quite a lot of audits, covering a wide range of products used in oil and gas industry, including: such as OCTG, drill pipes, valves, pumps, cyclone separator, water jacket heater, diaphragm compressor, commercial metering station, sulfur granulator, re-injection pumps, sulfur resistant seamless pipes, transformers, electrical switchgear, TEG unit, Metering pump, Shelter-In- Place H2S Temporary Refuge containerised module, water treatment equipments, diesel generator, flare system, solvents, piping fittings, instrumental fittings, separator, air blower, sulfur condenser, reheater, etc.).
Sunrise QC carries out the detailed quality management system audit, based on the requirements of QMS (e.g. ISO 9000:2000) and identifies the level of compliance. The report of the quality management system audit helps customer in making selection of the future partners for their buying projects. If required, Sunrise QC can also suggest the necessary corrective and preventive actions be taken for the non-conformities identified by the supplier being audited.
Engineering Back-up
This is to ensure that the samples being prepared and submitted to the customer do meet the requirements defined by the buyers. We can also verify the QCP(Quality Control Plan) ,ITP(Inspection and Test Plan),and /or MPS(Manufacture Process Schedule) to make sure that these documents are in consistent with the international standards or the technical specification agreed upon between the purchaser and the manufacturer.We also ensure that the supplier conducts the necessary tests and verifications during the design and pre-production stages. These activities can substantially cut down the cost that occurs due to quality problems raised during later stages with mass production.
Manufacturing Process inspection
Manufacturing process inspection further ensures that the agreed product specification is strictly implemented to all levels of the manufacturing processes. The activities can also identify the potential problems as well as the existing deficiencies, and help to work with the manufacturer for the corrective actions by eliminating discrepancies. These can ensure that the manufacturer conducts the necessary tests and inspections and the tests and inspections are being done in accordance with the QCP or ITP or international standards.
Product Quality verification
The final product verification (so called Pre-shipment inspection) performed by Sunrise QC verifies that the entire product lot falls within range of acceptable quality levels, according to the defined sampling inspection plans and the technical requirements. We can also check MTC(Mill Test Certificate) to ensure that every items shown in MTC are correct and are consistent with the packing list and other documents involved in order to avoid the discrepancies .In addition, we can offer to monitor the loading in the factory as well as the loading in the port. These activities help to confirm the integrity of the manufacture's quality management program, and to minimize the risk of the rejection at delivery destination.
Identifying Potential Suppliers
Sunrise QC assists to evaluate potential suppliers,based on our professionalism and sound understanding of the manufacturers in local area, by investigating their existing quality management systems, and identifying their strength and weakness. This evaluation identifies all unfavorable factors to the clients. Correct selection of suppliers ensures that both the final product quality and delivery schedule satisfy clients’ requirements.
Supplier Assessment
The work scope of supplier assessment includes:
1. Preliminary assessmment: Distribute the questionnaires, collect and analyze the documents submitted by the suppliers, and then prequalification analysis is made according to the evaluation procedure of SRQC.
2. Factory site audit: Site audit covers the QMS audit and technical competency survey as well as the social accountability evaluation of the potential suppliers.
So far, SRQC has conducted quite a lot of audits, covering a wide range of products used in oil and gas industry, including: such as OCTG, drill pipes, valves, pumps, cyclone separator, water jacket heater, diaphragm compressor, commercial metering station, sulfur granulator, re-injection pumps, sulfur resistant seamless pipes, transformers, electrical switchgear, TEG unit, Metering pump, Shelter-In- Place H2S Temporary Refuge containerised module, water treatment equipments, diesel generator, flare system, solvents, piping fittings, instrumental fittings, separator, air blower, sulfur condenser, reheater, etc.).
Sunrise QC carries out the detailed quality management system audit, based on the requirements of QMS (e.g. ISO 9000:2000) and identifies the level of compliance. The report of the quality management system audit helps customer in making selection of the future partners for their buying projects. If required, Sunrise QC can also suggest the necessary corrective and preventive actions be taken for the non-conformities identified by the supplier being audited.
Engineering Back-up
This is to ensure that the samples being prepared and submitted to the customer do meet the requirements defined by the buyers. We can also verify the QCP(Quality Control Plan) ,ITP(Inspection and Test Plan),and /or MPS(Manufacture Process Schedule) to make sure that these documents are in consistent with the international standards or the technical specification agreed upon between the purchaser and the manufacturer.We also ensure that the supplier conducts the necessary tests and verifications during the design and pre-production stages. These activities can substantially cut down the cost that occurs due to quality problems raised during later stages with mass production.
Manufacturing Process inspection
Manufacturing process inspection further ensures that the agreed product specification is strictly implemented to all levels of the manufacturing processes. The activities can also identify the potential problems as well as the existing deficiencies, and help to work with the manufacturer for the corrective actions by eliminating discrepancies. These can ensure that the manufacturer conducts the necessary tests and inspections and the tests and inspections are being done in accordance with the QCP or ITP or international standards.
Product Quality verification
The final product verification (so called Pre-shipment inspection) performed by Sunrise QC verifies that the entire product lot falls within range of acceptable quality levels, according to the defined sampling inspection plans and the technical requirements. We can also check MTC(Mill Test Certificate) to ensure that every items shown in MTC are correct and are consistent with the packing list and other documents involved in order to avoid the discrepancies .In addition, we can offer to monitor the loading in the factory as well as the loading in the port. These activities help to confirm the integrity of the manufacture's quality management program, and to minimize the risk of the rejection at delivery destination.